The Ultimate Georgia Rail-Trail Guide for Biking and Triking

Paved Silver Comet Trail through trees near mile 19 in Dallas, Georgia

Featured photograph: the Silver Comet Trail near mile 19 in Dallas, Georgia. John Phelan · CC BY 4.0. Resized for web.

A shady stretch of pavement. A comfortable seat. A town worth stopping in. Georgia’s rail-trails can turn an ordinary morning into the kind of day you want to repeat.

For a long paved ride, start with the Silver Comet Trail. For a manageable first outing, consider the S&S Greenway in Statesboro. For a small-town cycling weekend, look at the Man O’ War Trail around Pine Mountain and Hamilton. Coastal riders should separate Woodbine’s paved route from White Oak’s crushed-stone trail before choosing where to unload.

This guide brings together Georgia rail-trail destinations for recreational cyclists, recumbent trike riders, couples, and travelers carrying their bikes or trikes in an RV. It also includes two worthwhile paved greenway destinations, clearly identified below.

Georgia rail-trails at a glance

These are our starting recommendations based on surface, distance, setting, and the planning information available. “Good first option” does not certify a route for every rider or every trike.

Compare Georgia rail-trail destinations and bonus greenways
Destination Published trail length Surface Why choose it? Suggested outing
Silver Comet · Smyrna to Alabama 61.5 mi Paved Longer rides with several access towns 6–30 mi out-and-back
Man O’ War · Harris County 13.5 mi completed Asphalt A small-town weekend 6–12 mi out-and-back
Fall Line Trace · Columbus 10.5 mi mapped core; city lists 12 mi Asphalt/concrete Combine a rail-trail with a city visit 6–10 mi out-and-back
Firefly · Athens region Separate open sections; 39 mi is the planned corridor Paved open sections Athens, bridges, and railway heritage 2–4 mi on a confirmed open section
S&S Greenway · Statesboro 2.75 mi Paved A straightforward shorter outing 5.5 mi full out-and-back
Douglas Greenway · Douglas About 3 mi Asphalt A compact ride with a railway-history stop Up to about 6 mi out-and-back
Georgia Coast Rail-Trail · Woodbine / White Oak About 3 mi / 3.5 mi, disconnected Woodbine paved/boardwalk; White Oak crushed stone Marsh scenery and a coastal base Woodbine about 6 mi return
Atlanta Beltline Eastside 2.4 mi named Eastside section Paved Art, neighborhoods, and food stops Up to 4.8 mi out-and-back
Bonus: Carrollton GreenBelt 18 mi main loop Concrete A loop with multiple park access points 4–8 mi out-and-back, or 18 mi loop
Bonus: Jekyll Island paths More than 24 mi in the network Choose paved bike-path sections An island cycling vacation 6–10 mi selected route

Mileage sources and operator maps are linked in each destination section. Network totals are not promises of one continuous ride. McQueen’s Island Trail is listed separately under closures to know about.

Where these Georgia cycling destinations are

Georgia trail destination map with Atlanta, Athens, Columbus, Macon, Augusta, Savannah, Brunswick, Valdosta and six main interstate corridors
Open the full-size map. Locate trail destinations in relation to nearby cities and I-16, I-20, I-75, I-85, I-95, and I-185. Numbered markers show destination areas; use operator maps for exact trailheads and access. Map: Pickens Cycles. Boundaries and place reference points: U.S. Census Bureau, 2024. Interstate geometry: Georgia Department of Transportation. Jekyll location uses the geolocated source photograph.

What makes a rail-trail a good choice for a recumbent trike?

A converted railway often offers a useful starting point: a defined corridor, room to settle into a rhythm, and access away from through traffic. However, a rail-trail can still have road crossings, steep approaches, rough repairs, and narrow entrances.

For your first visit, favor a paved section with parking at the trail, a known restroom, and an easy turnaround. A three-mile outward leg makes a six-mile day. Start there if you are still learning the controls or working out your comfortable riding distance.

  • Check the whole trike’s width. Ask about bollards, gate openings, bridge entrances, and any detour. We have not measured those clearances on these routes.
  • Look beyond the main surface. A smooth trail may have a loose-gravel parking connection, raised pavement joints, or a tight ramp before you reach it.
  • Choose a usable stopping place. You need room to turn and wait without blocking other people, especially if dismounting takes time.
  • Plan for the return. Wind, heat, hills, and battery use can make the second half feel different. A powered trike still needs a realistic reserve.

A public description such as “accessible” does not establish that your specific trike fits every entrance. If a narrow passage would end your day, contact the operator before traveling. For transport planning, see our guide to folding recumbent trikes for RV travel.

Silver Comet Trail: the strongest starting point for a longer paved ride

Where: Smyrna through Cobb, Paulding, and Polk counties to the Alabama line. Length: 61.5 miles in Georgia. Surface: paved. The trail continues into Alabama as the Chief Ladiga Trail; that extension is additional mileage.

The Silver Comet is the natural anchor for a Georgia rail-trail vacation. Its length gives you room to build several different rides without needing to finish the entire corridor. Choose an access town, enjoy a section, and return for lunch rather than treating the state line as a requirement.

Where to start and how far to ride

Cobb County lists Mavell Road Trailhead at 4573 Mavell Road, Smyrna, and Floyd Road Trailhead at 4342 Floyd Road, Mableton. Floyd Road also has the Silver Comet Depot. Confirm current restroom availability and any shop services before relying on them.

Easy introduction: From Mavell Road, ride three miles west, turn in a suitable clear space, and return for a six-mile outing. Longer day: Choose a 10- or 15-mile outward leg for a 20- or 30-mile return ride. Use signed markers and the operator map to select the turnaround; these are distance-based suggestions, not claims that a particular café sits at that mileage.

What to build your day around

Hiram, Dallas, Rockmart, and Cedartown offer alternative bases farther west. Select the section you want before choosing lodging. A stay near Smyrna will feel quite different from a quieter outing farther along the corridor.

Trike planning: Do not assume all 61.5 miles have the same grade or level of services. The Paulding County trail overview is a useful second planning source for the western portion. Check elevation and services for the actual segment you choose, carry water, and allow for road crossings. Cobb specifies daylight use.

Food and stay: Make a town visit part of the trip, but map the connection from trail to restaurant. A business described as “near the trail” may require a street ride. For a first weekend, staying near your chosen trailhead and carrying a picnic is a simple way to keep the day flexible.

Man O’ War Trail: Pine Mountain, Hamilton, and an unhurried weekend

Where: Harris County, southwest of Atlanta. Completed length: 13.5 miles from the county line in Pine Mountain south to Mulberry Creek. Surface: asphalt.

The Man O’ War Railroad Recreation Trail combines a rail corridor with towns that give you a reason to stop. It is a good candidate for couples who want a morning ride and another activity in the afternoon.

Harris County’s completion notice identifies parking access at locations including downtown Pine Mountain, Hood, Callaway Country Store, Hamilton Square, and South Hamilton. Trailhead kiosks show mileage, elevation, and amenities. Use the current kiosk map to choose a restroom stop rather than assuming every access point has one.

Suggested ride: Start at downtown Pine Mountain or Hamilton Square, ride three to six miles in the direction shown on the map, and return for six to 12 miles total. Riding the entire completed corridor and returning is approximately 27 miles; that is a substantially bigger day.

Trike planning: The tourism operator describes a 10-foot-wide asphalt trail, but the paved width does not verify the width at gates or crossings. The route has elevation changes; use the published profile to pick a comfortable section.

Food and stay: Plan a meal in Pine Mountain or Hamilton after the ride. F.D. Roosevelt State Park offers cottages and tent, trailer, and RV camping as a regional base. Drive to your chosen trailhead; the state park’s hiking network is a separate experience.

E-assist: Harris County tourism explicitly welcomes e-bikes, but its listing does not resolve every class or three-wheel configuration. Confirm your equipment with the operator. The further extension toward Columbus is a development project, not a connection to assume is finished.

Fall Line Trace: a Columbus ride with a city break

Where: Midland and Columbus, with a connection toward the Chattahoochee Riverwalk. Surface: asphalt and concrete. Distance: TrailLink maps a 10.5-mile route; the city’s visitor overview describes 12 miles. Measure from your actual access points.

The appeal here is variety: a former rail corridor, park access, neighborhoods, and a visit to Columbus. The connected Riverwalk offers another outing, but its mileage belongs to a separate trail.

Start and facilities: Psalmond Road is an eastern access option. TrailLink also lists Manchester Expressway parking and describes a rest area with restrooms and drinking water. Check the current map for the correct entrance and confirm facility hours before arrival.

Suggested ride: Begin with three to five miles outward and return for six to 10 miles. Choose the eastern portion if your priority is a shorter trail outing, then drive downtown for food and the riverfront rather than adding an unfamiliar city connection late in the day.

Trike planning: Expect public-road crossings and changes between pavement types. Review the route closely before treating it as an uninterrupted countryside ride.

Firefly Trail: enjoy the open pieces around Athens

Where: Athens-Clarke County, Winterville, and communities along the former Athens Branch rail corridor toward Union Point. Surface: paved completed sections. Important distinction: the often-mentioned 39 miles describes the planned corridor, not a single completed trail ride.

Firefly Trail bridge across South Peter Street in Athens, Georgia
The Firefly Trail bridge at South Peter Street in Athens, photographed in 2018. Check current opening notices for your route. Photo: Michael Rivera · CC BY-SA 4.0. Resized for web.

The Firefly is worth considering when you want a shorter ride alongside an Athens visit. Athens-Clarke County’s trail overview describes the rail history, river crossings, and access around the eastern side of downtown. Firefly Trail, Inc.’s progress map shows how completed sections fit within the larger project.

Access: Dudley Park is one Athens-area starting point. The nonprofit also lists parking in Maxeys, Union Point, and Woodville. Those are separate trip-planning choices; their presence on one project map does not establish a paved through connection.

Suggested ride: Choose an open Athens section, ride one to two miles, and return for two to four miles. If you want to go farther, identify the exact connected mileage before unloading. Plan your café or downtown meal after returning to your starting area.

Trike planning: Bridges, ramps, and connections deserve a slow first approach. Ask the county about any narrow access controls and confirm restrooms separately from trail access. The bridge photograph illustrates the setting; it does not establish current clearance or opening status.

S&S Greenway: a particularly useful shorter ride in Statesboro

Where: Statesboro, in Bulloch County. Length: 2.75 miles one way. Surface: paved, with a published 12-foot multi-use width.

The S&S Greenway follows the former Savannah & Statesboro Railroad right-of-way. Its defined endpoints and facilities make it one of our strongest starting suggestions for someone looking for a compact rail-trail day.

Access and facilities: The Gentilly Road trailhead has paved parking, restrooms, and information signs. The opposite trailhead, at Pretoria-Rushing and Burkhalter roads, also lists parking, restrooms, water fountains, benches, and a picnic area.

Suggested ride: Ride the full 2.75 miles and return for 5.5 miles, or turn around after one mile for a two-mile introduction. Carry your own water even when fountains are listed.

Trike planning: The trail passes under the US 301 Bypass but crosses Cawana Road at grade. Stop and assess traffic there. Confirm gate spacing before a trip that depends on uninterrupted access.

Make a day of it: Bring a picnic, then visit downtown Statesboro. The Blind Willie McTell Trail is a separate paved greenway between Memorial Park and downtown Triangle Park. Treat it as an additional outing, not a confirmed trail-only connection from S&S.

Douglas Greenway: a short South Georgia rail-trail

Where: Douglas, in Coffee County. Length: approximately three miles according to TrailLink. Surface: asphalt.

The city describes the Greenway as a former railroad repurposed for walking and cycling, running between the Douglas Square area and J.C. Adams Municipal Park. This is a useful option when a modest ride fits your travel day better than a full-day cycling destination.

Suggested ride: Choose a mapped access point, ride one to three miles outward, and return for two to six miles. The Heritage Station Museum provides a railway-history stop in town; check its current visiting arrangements rather than assuming the museum is open whenever the trail is.

Trike planning: Check the crossing pattern and parking-to-trail transition on the city map. Restrooms and water are not confirmed at every entrance, so arrange those stops before starting.

E-assist: The city’s page says “No motorized bikes or vehicles.” Ask the city specifically about electric bicycles and three-wheel electric cycles; that phrase alone does not resolve the equipment categories.

Where to stay: General Coffee State Park, east of Douglas, offers camping and cottages. It works as a regional base with a drive to the Greenway; do not assume a dedicated paved connection between the campground and town.

Georgia Coast Rail-Trail: choose Woodbine and White Oak as separate rides

Where: Camden County, in coastal southeast Georgia. The two sections have different surfaces and are not a continuous paved ride.

Woodbine: the paved starting choice

The City of Woodbine describes its Riverwalk and rail-corridor trail as a combination of waterfront boardwalk and a wide paved route. The city’s segment descriptions total about 2.9 miles; local tourism commonly rounds it to three.

Start: Satilla River Waterfront Park, 103 E. 1st Street, has parking and restrooms. The city also identifies Theater Park as connected access. The trail is a daylight destination.

Suggested ride: Explore the mapped Woodbine route and return for approximately six miles, adjusting for the access point and waterfront side paths. Leave time to enjoy the river rather than racing to a mileage target.

Trike planning: Approach boardwalk transitions and narrow entries slowly. Paved rail-trail and waterfront boardwalk are different surfaces; check whether your chosen outing includes both. Use the city’s local business listings to plan a meal, and confirm hours before arriving.

White Oak: a crushed-stone alternative

Camden County lists a 3.5-mile White Oak Nature Trail, with access around US 17, Refuge Road, and GA 252. Kingsland tourism identifies the rail-trail surface as crushed stone.

A full 3.5-mile outward leg and return would be approximately seven miles. For a trike, first confirm present surface firmness, washouts, bridge condition, and usable entrance width. A narrow high-pressure tire and a small front wheel can make loose stone feel very different from asphalt. Choose Woodbine first if smooth pavement is your priority.

Coastal planning: Carry water, sun protection, and insect repellent. Check storm notices before traveling. Long-range Georgia Coast Rail-Trail and East Coast Greenway maps include future or on-road connections; they do not establish a continuous traffic-free coastal cycling route.

Atlanta Beltline Eastside: an urban rail-corridor experience

Where: central Atlanta. Named Eastside section: 2.4 miles from the Monroe Drive/Piedmont Park area to Krog Street Tunnel, according to the Beltline’s trail naming guide. Surface: paved.

Atlanta Beltline Eastside Trail passing trees and buildings in Inman Park
An Eastside Trail scene in Atlanta’s Inman Park, photographed in June 2026. The number of people on the trail varies by time and day. Photo: John Phelan · CC BY 4.0. Resized for web.

Come for the neighborhoods, public art, and places to stop. This is a different kind of rail-trail day from a wooded Silver Comet ride. The experience depends heavily on how many other people are using the path.

Suggested ride: Explore the named Eastside section and return for up to 4.8 miles. Choose an off-peak weekday morning if you want a more relaxed pace. You can also make the ride shorter and spend longer at one destination.

Access and stops: Use the official trail map to choose a step-free entrance and lawful parking. Plan food stops around the Ponce City Market or Krog Street areas, leaving the path clear while you lock up. Restroom access can depend on the individual park or business.

Trike planning: Busy entrances, people changing direction, and tight parking spaces call for patience. Wait for a generous passing gap. This is a sightseeing ride, not a place to hold a training speed through pedestrians.

Do not mistake the project for a finished loop: The operator currently describes nearly 17 mainline miles plus connector trails, while the overall Beltline vision is a 22-mile loop. Use the current map for completed connections. The operator’s rules and etiquette page is also the right starting point for access questions, including your particular e-assist configuration.

Two more Georgia cycling destinations worth adding

The following networks belong in a Georgia biking and triking vacation guide, but they should not be presented as converted rail corridors.

Carrollton GreenBelt: a paved loop with several starting points

Where: Carrollton, west of Atlanta. Length: an 18-mile main loop, with additional connections. The operator describes a concrete path linking neighborhoods, parks, schools, and destinations around the city.

Start: Laura’s Park at Hays Mill Trailhead, 480 Hays Mill Road, lists parking, restrooms, water, a pavilion, and a bike repair station. Other choices include Lakeshore Park and Hobbs Farm Park.

Suggested ride: Ride two to four miles outward and return for four to eight miles. For an experienced rider seeking a longer outing, complete the approximately 18-mile loop once. A loop is already a complete circuit; it does not need to be doubled like an out-and-back.

Trike planning: This is a city greenway, not a guarantee of railway-style grades. Review hills, road crossings, and your return route. The rules specify non-motorized use and daylight hours; obtain clarification before bringing an e-trike.

Jekyll Island: build a cycling vacation around an island network

Where: Georgia’s Golden Isles. Network: more than 24 miles of paths and trails. This is a network total, not a single 24-mile rail-trail or a promise that every path has the same surface.

Salt marsh and trees beside a wooden boardwalk on Jekyll Island, Georgia
Jekyll Island’s coastal setting, photographed beside a boardwalk in 2011. Plan your ride on designated bike paths using the current authority map. Photo: Scott Long · CC BY 3.0. Resized for web.

Suggested ride: Use the authority’s bike-path map to choose six to 10 miles of paved riding around the Historic District and appropriate connecting bike paths. Include a café or picnic stop. Choose the route from your actual accommodation or parking location, then measure the whole circuit.

Trike planning: Ask about narrow approaches, roots, sand on pavement, and crossing locations. Beach sand and informal nature paths are different from designated paved bike paths. Stay on the routes intended for cycling and follow the island’s riding guidance.

Stay: Jekyll Island Campground offers RV sites, bathhouses, and utilities; island lodging gives non-campers another option. Confirm your site length, slide clearance, electrical needs, and current entry/parking charges when booking. A nearby path does not automatically make every campground access suitable for every trike.

A Georgia rail-trail to keep on your watchlist: McQueen’s Island

McQueen’s Island Trail near Savannah follows the former Savannah & Atlantic Railroad corridor through a coastal marsh setting. It belongs on a future-trip list rather than in a guaranteed-open itinerary.

Are electric bikes and electric trikes allowed on Georgia rail-trails?

Permission is route-specific. Check the actual trail manager’s current rule, your equipment’s class, and whether it has two or three wheels or a throttle. A general statement about bicycles, an e-bike rental nearby, or other riders using motors is not enough to settle access.

What the reviewed operator material establishes
Trail Published information Before bringing an e-trike
Man O’ War Tourism listing welcomes e-bikes. Confirm class, throttle, and three-wheel configuration.
Fall Line Trace City-published rules specifically restrict electric vehicles with more than two wheels, with an exception. Ask Parks and Recreation for current applicability and permission.
Douglas / Carrollton Operator pages use non-motorized or motorized-vehicle restrictions. Ask how the operator treats electric bicycles and electric trikes.
Other destinations in this guide The sources reviewed do not establish blanket permission for every e-trike configuration. Get a route-specific answer from the responsible operator.

A useful question is: “May I ride a three-wheel electric cycle with pedals, [your motor rating], [your assistance cutoff], and [with/without] a throttle on [the exact trail section]?” Describe your real equipment. Do not assume leaving a throttle unused changes the operator’s classification.

Our guide to Class 1, Class 2, and Class 3 e-bikes explains the equipment categories. The operator decides access to its trail, and posted instructions apply to your visit.

Three Georgia cycling weekends to consider

A longer-trail weekend: Silver Comet

Day one: Settle into your lodging and ride six to 10 miles from an access point near your base. Check fit, comfort, and supplies. Day two: Choose a 20- to 30-mile out-and-back if the first day felt comfortable, or try another six- to 10-mile section from a different trailhead. These are two independent rides; driving between trailheads is part of the plan.

A small-town weekend: Pine Mountain and Harris County

Day one: Ride six miles total on Man O’ War, followed by a meal in town. Day two: Extend to a 10- or 12-mile outing or spend the day exploring the Pine Mountain area. Base the second day on everyone’s energy rather than a fixed mileage goal.

A coastal sampler: Woodbine and Jekyll Island

Day one: Enjoy roughly six miles out-and-back in Woodbine and time beside the Satilla River. Day two: Drive to Jekyll Island and choose a mapped paved outing of six to 10 miles. These destinations are separate driving stops. This itinerary does not imply a trail-only connection between them.

RV camping and lodging bases for a Georgia triking trip

Book the accommodation that works for your vehicle and riding plan. The following are starting points for reservations, not claims of availability or direct paved trail connections.

Regional bases with official booking information
Riding area Base to investigate Planning note
Pine Mountain / Man O’ War F.D. Roosevelt State Park Cottages and RV camping; drive to the rail-trail.
Carrollton John Tanner Park County RV camping with full-hookup and water/electric site categories; confirm the assigned site.
Douglas General Coffee State Park Cottages and RV camping east of town; transport the trike to the Greenway.
Jekyll Island Jekyll Island Campground Island base; confirm site fit and the usable bike-path connection.
Silver Comet / Athens / Columbus Lodging near the chosen access area Ask about secure trike storage, ground-floor access, charging permission, and parking.

For a large motorhome, fifth wheel, or trailer combination, check total length and turning room with both the campground and trailhead operator. A parking symbol on a trail map does not establish space to unload a long vehicle combination. An RV campsite reservation also does not authorize overnight parking at a trailhead.

When to go and what to carry

Spring and fall are our first seasons to investigate for longer recreational rides. Check the actual forecast, local events, and your tolerance for heat or cold before choosing dates. A coastal morning and a north Georgia morning can call for different clothing.

Summer: Favor an early start, a shorter route, water, and planned shade breaks. Stop or turn around when conditions no longer suit the group. Winter: Allow for shorter daylight and possible ice on bridges or shaded pavement. After storms: Check flooding, downed trees, debris, and official reopening notices before heading out.

For an uncomplicated day, carry a helmet, drinking water, snacks, a charged phone, identification, a lock, sun protection, and the repair supplies you know how to use. Add insect repellent for coastal or wetland outings, a light layer for changing conditions, and an offline copy of the route.

On a recumbent trike, set your mirror before leaving and use suitable visibility equipment. Learn your foot-retention system and how to release it before riding. Keep feet supported on the pedals while moving; stop with the brakes before putting feet down. Check tire pressure, brakes, battery charge if fitted, and any folding latches before each outing.

Keep right, pass only with space, give an audible warning, and yield to pedestrians. A posted speed limit is a maximum, not a speed you must maintain. Leave the travel lane clear when stopping for a photograph or conversation.

Georgia rail-trail questions, answered

What is Georgia’s longest paved rail-trail?

The Silver Comet Trail extends 61.5 miles across Georgia from Smyrna to the Alabama state line, where it connects with the Chief Ladiga Trail. Choose a section that suits your riding distance; the Georgia mileage alone would make a 123-mile full out-and-back.

Which Georgia rail-trail is a good first outing?

The S&S Greenway in Statesboro is a strong shorter-ride candidate because the operator lists a 2.75-mile paved route, a 12-foot path width, and facilities at both ends. The full out-and-back is 5.5 miles. Confirm entrance clearance and stop carefully at the Cawana Road crossing.

Can a recumbent trike use these Georgia trails?

A paved multi-use trail may suit a recumbent trike, but check your vehicle’s width, gate openings, bridges, crossing approaches, and current detours. This guide does not certify access for every trike. Electric trikes also need equipment-specific permission from the trail manager.

Are electric trikes allowed on every Georgia rail-trail?

No blanket permission is established by the sources in this guide. Ask the manager about the exact route, three-wheel configuration, motor rating, assistance cutoff, and throttle. Columbus has published a specific restriction on electric vehicles with more than two wheels, so current confirmation is particularly important there.

Can you ride the full 39-mile Firefly Trail today?

Do not plan a continuous 39-mile trail ride based on the project’s advertised corridor length. Completed sections and remaining gaps must be checked on the current progress map. On November 9, 2026, the county status page also identified a closure at Hancock Road.

Is the Georgia Coast Rail-Trail one continuous paved trail?

The Woodbine and White Oak sections described here are disconnected and have different surfaces. Woodbine offers approximately three miles of paved trail and waterfront boardwalk connections. White Oak is listed at 3.5 miles with a crushed-stone surface. Plan separate outings and verify current conditions.

What is the best season for a Georgia cycling trip?

Spring and fall are useful starting choices for a recreational cycling vacation. Match your dates to the forecast, daylight, and your group’s comfort. Start early in summer, check for ice or cold conditions in winter, and read flood or storm notices before coastal and riverside rides.

Which Georgia riding destinations have RV camping bases?

Examples include F.D. Roosevelt State Park for the Pine Mountain area, John Tanner Park near Carrollton, General Coffee State Park near Douglas, and Jekyll Island Campground. Verify the individual site’s dimensions and utilities. These bases do not all have dedicated paved connections to the featured trails.

Are Jekyll Island’s bike paths and Carrollton GreenBelt rail-trails?

They are included as bonus greenway destinations, not as converted railway corridors. Jekyll Island has a network of more than 24 miles of paths and trails; Carrollton’s main GreenBelt loop is approximately 18 miles. Use their operator maps to select the actual route.

Find the ride you want to do again

The right destination starts with a distance and setup that feel comfortable. Pickens Cycles is based in the Greenville/Greer area of South Carolina, within reach of a wider Southeast cycling adventure.

Explore our recumbent trikes, use the fit guide, or arrange a demo ride to discuss your trails and transport needs. Confirm current demo availability and equipment when booking.

Adventure without the tradeoffs.

Sources and how we checked this guide

This guide prioritizes operator and government information, with Rails-to-Trails Conservancy’s TrailLink used for selected route lengths and descriptions. Published facts are linked beside the relevant destination. Ride ideas, comparisons, and itineraries are Pickens Cycles’ editorial suggestions.

Research date: November 9, 2026. We favored dated completion and closure notices over older project summaries. Where published mileages differ, the guide identifies the difference. Gate clearances, current pavement quality, restroom operation, campground availability, and equipment-specific e-trike permission have not been verified in person.

For conditions, use Cobb County, Harris County, Athens-Clarke County, Bulloch County Recreation, Douglas Parks and Recreation, Woodbine, Camden County, Atlanta Beltline, Carrollton GreenBelt, and Jekyll Island Authority.

Extending your trip into South Carolina? Start with our Swamp Rabbit Trail guide for Greenville and Travelers Rest.